To the central content area

112 Annual Soil and Groundwater Pollution Investigation and Verification Work Plan-Keelung City

Absrtact
Keelung City actively promotes soil and water-related businesses, which include (1) understanding the overall quality of groundwater, (2) improving the efficiency of supervision and management of managed sites, (3) coaching and tracking the independent management of pollution prevention and storage systems, and (4) grasping high pollution potential , (5) promote the prevention of industrial land pollution and (6) improve the emergency response mechanism. This plan assists the above key tasks and provides management and response plans. Taisong Technology Co., Ltd.'s groundwater heavy metal test results from the first to fourth quarters were lower than the regulatory standards, but ammonia nitrogen exceeded the monitoring standard. It is recommended that Taisong Technology Co., Ltd. allocate funds to conduct regular monitoring (at least once a year) based on operating conditions. Taiwan Arakawa Chemical Industry Co., Ltd., Taiwan Fertilizer Keelung Plant (downstream well) and Fuji Weaving (next to the sewage facility) have all had ammonia nitrogen exceeding monitoring standards over the years, but there has been no sudden increase trend. It is recommended that relevant tracking be continued. The overall monitoring functions of the groundwater monitoring wells are all normal, with 3 maintenance and updates, 2 facility repairs, and 6 internal maintenances. The basic structure is complete and good, and the water return conditions are all moderate. Through quarterly site progress management, pollution improvement efficiency has been improved. Two sites have been decommissioned and currently two sites are under management. The improvement progress of the Badouzi Fishing Boat Gas Station is in line with the scheduled schedule. The excavation work in the Badou reservoir area has been suspended due to pipeline problems. If you are already lagging behind, you should take safety into account according to the technician's assessment and rush plan to reach the scheduled progress as soon as possible. There were no abnormalities in the three-quarter review of the storage system declaration. Completed follow-up inspections of 4 companies, 1 has completed improvement, and the remaining 3 companies continue to follow up to ensure completion before the improvement deadline; additional review of 5 large storage tanks has been completed, and improvements have been completed (with the approval of the Environmental Protection Bureau, alternative methods have been adopted to explain ). The VOCS and TPH test results of soil sampling at Hepingdao Fishing Boat Gas Station at 10 points were all below the monitoring standards. The Industrial Development Office submitted a list of 6 closures, which were not businesses announced in Articles 8 and 9. Two enterprises were notified, and the comparison between the current survey results and the soil survey data was correct. The technician visa inspection target is Xiangjing Technology Co., Ltd. The meeting decided that the total points were 10 points (first level), and a letter was sent to the technicians under inspection to urge them to improve the quality of their visas. Based on the results of 30 on-site explorations from 109 to 111, after screening through the weighted statistical list, Yuanlai Environmental Protection Co., Ltd. took 4 soil sampling points (heavy metals, TPH, VOCS). Only the heavy metal nickel exceeded the monitoring standard. It is recommended that Yuanlai Company conduct regular monitoring at least once a year. times; 4 soil sampling points (heavy metals, TPH, VOCS) were taken from the machinery factory of Shengda Technology Co., Ltd., and the test items were all below the regulatory standards. Through on-the-spot survey and preventive management briefings, enterprises were guided to fill out relevant forms in the system. After on-site survey, 9 Group C enterprises were recommended to maintain Group C. All 18 Group B businesses have filled out independent prevention management plans and revised them based on review opinions. After on-site exploration and evaluation of the four A-group enterprises, Xingye Metals scored 8 points, and soil sampling was carried out 3 times at the site. The test items were heavy metals and total petroleum hydrocarbons. Heavy metals lead and arsenic were detected in the process area AS02 and exceeded the soil pollution control standards. Heavy metal lead, cadmium and arsenic were detected in the heavy oil tank site AS03 and exceeded the soil pollution control standards. It is recommended to declare soil pollution in accordance with Article 12, Item 2 of the Soil Pollution Law. Control site. Crop planting in Qidu District was sampled simultaneously, and the test results for bamboo shoots were both N.D. for cadmium and lead. According to regulations, there is no need to perform soil sample XRF screening and soil sample analysis. The 7 agricultural lands are mainly used for planting bamboo shoots and vegetables. The irrigation water sources are rainwater and mountain spring water. There are no factories or industries with pollution potential within 1.5 kilometers. The on-site soil and water quality screening results show no pollution. Qidu The initial water quality test at No. 46, Shanggu Section, Malingkeng District, was pH 4.5, and then the water quality was retested for four heavy metals (chromium, copper, nickel, and arsenic). The test results were all lower than the monitoring standards Comparing the regulatory publicity and briefing sessions with those held in 2011, the participants’ understanding of key regulations has improved. We held a matchmaking briefing on solar photovoltaic facilities. Seven companies were willing to install photovoltaic facilities, and on-site counseling was completed for three companies. As the owners considered issues such as installation costs and administrative procedures for submitting documents to Taipower, they needed to re-evaluate the installation possibilities. Understand the distribution of off-site oil pipelines, oil pipeline management models and emergency response methods of the CNPC Oil Supply Center within the jurisdiction, as a reference for subsequent investigations. Cooperate with the Maritime Science and Technology Museum to conduct seed teacher talent training, integrate publicity materials and resources, and establish diversified publicity channels. The stage play tour (What's the Little Water Drop Crying for) performed 3 times (reaching 1,500 people). For the first time, it cooperated with the Education Department to perform 1 time at the Children's Art Festival. Another campus performance (Xinyi Elementary School) was selected for video shooting and 50 CDs were produced. The film (with subtitles) was distributed to primary schools within the jurisdiction. The Little Water Drop Crying AR (IOS system) APP will be on the shelves from May 20, 2012 to May 19, 2013. The test results reported regularly by Dawulun Industrial Zone are all below the monitoring standards and there are no abnormalities. After completing the current survey of Xishi and Xinshan reservoirs, it is recommended that the competent authorities increase the frequency of testing and compare the numerical changes year by year. The total emergency response expenditure was NT$199,500. Taiwan Fertilizer Company Keelung No. 1 Plant soil was sampled at 3 points. Heavy metals, volatile organic compounds (VOCs), total petroleum hydrocarbons (TPH) and polychlorinated biphenyls did not exceed the control limit. standard. Soil sampling at Badouzi Fishing Boat Gas Station was conducted at 2 points (total petroleum hydrocarbons), and the test results did not exceed the regulatory standards.
Keyword
soil and groundwater
Open
top